Before Your Tile Arrives



  • relocate furniture
  • empty china cabinets and closets
  • consider removal and disposal of old floorcovering
  • remove it yourself and leave 1 day before install
  • moldings and baseboards need to be removed for stone installation
  • installers not responsible for damage or breakage due to dry or brittle wood
  • painted baseboards, woodwork and paint may need retouching ( this is your responsibility)
  • existing sub floor may need to be prepared to receive the stone

oor plan

  • possibility that doors may not clear the new floor and swing free
  • installers may remove doors and re-hang for an additional cost
  • for clearance issues, arrange for a qualified carpenter to shave or cut down

Clean-up

  • waste will be produced
  • waste collected and disposed of by installers at an additional cost
  • dust will be spread during the installation

Installation day

  • be home and available
  • be prepared for questions
  • presence insures the right tile is installed in the right areas
  • exact time of arrival cannot be guaranteed, only a time frame

Safety

  • installers use tools and techniques that can be hazardous
  • make sure that children and pets are out of the work area
  • prior to completion, walk through and ask questions to be clear on any final details